NJ Transit spokesman Dan Stessel says Amtrak is inspecting the overhead wire in one of the two Hudson River tunnels. Stessel says a train on Tuesday experienced damage to the device that connects to the wire.
Amtrak and NJ Transit trains are single tracking in and out of New York.
NJ Transit trains are operating up to 30 minutes behind schedule.