Gas main fixed; White Horse Pike reopens

BARRINGTON, N.J. - May 16, 2012

The main break happened in the area of Route 295 in Barrington, New Jersey.

The White Horse Pike was shut down in the area around 10:00 a.m. so that crews could repair the 12-inch main.

Crews were eventually able to fix the main and the roadway was reopened around noon.

There is no word on what caused the break.

Copyright © 2025 WPVI-TV. All Rights Reserved.