California Department of Transportation director Randy Iwasaki says workers won't be able to complete work to repair a crack in the span by 5 a.m. Tuesday, when the bridge was scheduled to reopen.
The bridge was shut down over the holiday weekend so a section of the eastern span could be cut out and replaced with a new double deck section as part of a seismic upgrade. Crews used the closure to inspect the bridge, discovering the crack Saturday.