Repairs that have closed the Washington Crossing and Calhoun Street bridges are wrapping up.
The Trenton Times reports the Washington Crossing Toll-Supported Bridge that links Hopewell Township and Upper Makefield, Pa., should reopen Friday morning.
The Calhoun Street Toll-Supported Bridge, which connects Trenton with Morrisville, Pa., is expected to reopen Friday night.
Additional renovations may require lane closures into October.
---
Information from: The Times, http://www.nj.com/times